top of page
Hellas Gold Factory
The El Dorado GoldFactory at Skouries,Chalkidiki is a projectunder constructionbuilt in a plotarea of 250.000 m2.The complex consistsof a gold productionplant, laboratories, administrationbuilding,a substation 150/20KW etc. The total builtarea exceeds 12.000m2 and the estimatedcost 210.000.000 €.
bottom of page